HAUTE RESIDENCEHL REAL ESTATE GROUP☎ +1 (800) 257-5661
Newsroom · Buyer Intelligence

Snowbird season: new South Florida towers you can move into now

By Haute Residence Editorial ·
Snowbird season: new South Florida towers you can move into now

Fifteen new-construction condominium towers in Miami-Dade, Broward and Palm Beach County are already complete, including a Brickell waterfront tower that received its temporary certificate of occupancy in February 2026 and a West Palm Beach tower completed in June 2026. This is a list of delivered buildings, not of unsold inventory.

The light is different here in winter: clearer, lower, and already on the water when you land. At 500 Alton Road, a 48-story tower stands 519 feet over a three-acre public park. That is Five Park, completed in 2024, still the tallest residential building on Miami Beach.

A few miles across the bay, a 66-story tower sits on the Miami River at 300 Biscayne Boulevard Way. Aston Martin Residences finished that same year. In South Brickell, Una Residences, a 47-story waterfront tower, received its temporary certificate of occupancy in February 2026.

Advertisement

This winter, you can move into new-construction towers that are already delivered. Una Residences in Brickell received its temporary certificate of occupancy in February 2026. It joins 2024 and 2025 completions that include Five Park in Miami Beach, Aston Martin Residences on the Miami River, Aria Reserve’s south tower in Edgewater, and Pier Sixty-Six Residences in Fort Lauderdale, where the last building received its certificate of occupancy in 2025. Fifteen delivered towers are listed below, ordered by completion year. A finished building is not the same as unsold inventory; request current availability before you plan a move.

If you want keys this season, start here, not with a fourth-quarter target that is still an estimate. Several well-known towers still sit in a final construction phase, or still carry a 2026 or 2027 delivery date. Those belong on a delivery calendar. They do not belong on a move-in-now list. What follows is the shorter set: new-construction condominium buildings already completed or delivered.

For the wider pipeline, start with Miami new developments. For dates that are still estimates, see the Q4 2026 delivery calendar.

New-construction towers already delivered, by completion year
Tower Neighborhood Residences Stories Completion
Aston Martin Residences Downtown Miami 391 66 Completed 2024
Five Park Miami Beach 98 48 Completed 2024
Forte on Flagler West Palm Beach 41 25 Completed 2024
Mr. C Residences Bayshore Tower Coconut Grove 121 20 Completed 2024
Onda Residences Bay Harbor Islands 41 8 Delivered 2024
Pier Sixty-Six Residences Fort Lauderdale 88, in four buildings Four buildings Delivered 2024; final building certificate of occupancy in 2025
The Avenue Coral Gables 54 8 Completed 2024
Aria Reserve South Tower Edgewater 383 62 Delivered 2025
Una Residences Brickell 129 47 Temporary certificate of occupancy, February 2026
Alba Palm Beach West Palm Beach 55 22 Completed June 2026
Alana Bay Harbor Islands 30 7 Completed 2026
Bay Harbor Towers Bay Harbor Islands 44, in two towers 8 Completed 2026
La Baia South Bay Harbor Islands 68 8 Completed 2026
NoMad Residences Wynwood Wynwood 329 9 Completed 2026
The Well Bay Harbor Islands Bay Harbor Islands 64 8 Completed 2026

Most of these towers do not publish a current starting price; pricing is by request. A completed tower may already be largely sold. Confirm what, if anything, can still be bought before you book a flight around a closing.

Request current price sheets, floor plans, deposit schedules and rental rules for Five Park, Una Residences, Pier Sixty-Six Residences, Alba Palm Beach and the other delivered towers on this list.

Request Pricing & Floor Plans

The 2024 completions, already through a first season

Aston Martin Residences rises 66 stories above the Miami River at 300 Biscayne Boulevard Way in Downtown Miami, with 391 residences. It suits you if you want a finished riverfront tower and a downtown address you can occupy this winter, not a 2028 skyline promise.

Advertisement

Five Park, at 500 Alton Road in Miami Beach, is a 48-story, 98-residence tower completed in 2024. It stands 519 feet and sits with a three-acre public park at its base. It suits you if you want height on the west side of the Beach and a park at the door, rather than a walk over to the sand from a still-rising mid-beach site.

Mr. C Residences Bayshore Tower is a 20-story, 121-residence building completed in 2024 at 2655 South Bayshore Drive in Coconut Grove. It suits you if you want a finished bayshore address in the Grove and do not want to wait on later Coconut Grove towers still in sales.

Farther north, Forte on Flagler is a 25-story, 41-residence boutique tower completed in 2024 at 1309 South Flagler Drive in West Palm Beach. It suits you if you want a smaller, already-delivered Flagler building and a winter in Palm Beach County without a 2027 or 2028 closing.

Advertisement

Two lower-rise buildings also finished in 2024. Onda Residences is an 8-story, 41-residence boutique building at 1135 103rd Street in Bay Harbor Islands, delivered that year, with 300 feet of bay frontage. The Avenue is an 8-story, 54-residence building at 351 San Lorenzo Avenue in Coral Gables. Onda suits you if you want a finished, smaller bayfront building in Bay Harbor. The Avenue suits you if you want a walkable Gables address in a building that is already complete.

In Fort Lauderdale, Pier Sixty-Six Residences is an 88-residence collection across four buildings on the Intracoastal at 17th Street. It was delivered in 2024, and Indigo, the final building, received its certificate of occupancy in 2025. Residences are listed from $5.9 million, and inventory is described as available. It suits you if you want a finished home on a resort-marina campus and a published starting price to begin the conversation.

A 2025 south tower on the Edgewater bay

Aria Reserve South Tower was delivered in 2025: one of two 62-story towers on five acres of waterfront in Edgewater, with 383 residences and a zig-zag glass facade. Residences have 10-foot ceilings and oversized balconies, and every home looks at the water. Only the south tower is on this list, because that is the tower that has been delivered. It suits you if you want a finished, high-count bayfront tower and will confirm whether the residence you want is in the delivered south building.

The 2026 keys, including a February certificate in Brickell

Una Residences is the date that matters most if you are timing a winter move. The 47-story, 129-residence waterfront tower at 175 SE 25th Road in South Brickell is the first new waterfront condominium to deliver in Brickell in more than a decade, and it received its temporary certificate of occupancy in February 2026. It suits you if you want a finished Brickell bayfront home this season and will ask what remains for sale.

Alba Palm Beach is a 22-story, 55-residence waterfront tower at 4714 North Flagler Drive in West Palm Beach, completed in June 2026. It sits on the Intracoastal in the Northwood district, and the residences include a limited collection of two- and three-story townhomes with private plunge pools. It suits you if you want a finished Flagler waterfront address this winter, in a smaller tower than the ones still rising farther down the corridor.

Advertisement

In Wynwood, NoMad Residences Wynwood is a nine-story, 329-residence building at 2700 NW 2nd Avenue, completed in 2026. It suits you if you want a finished, hospitality-branded address in Wynwood rather than a downtown or beach tower.

Bay Harbor Islands added a cluster of completed boutique buildings in 2026: Alana, a 7-story, 30-residence building at 9901 West Bay Harbor Drive, with a curvilinear facade; Bay Harbor Towers, two 8-story buildings with 44 residences on the Indian Creek waterway at 10141 East Bay Harbor Drive; and La Baia South, an 8-story, 68-residence building at 9201 East Bay Harbor Drive.

The Well Bay Harbor Islands is an 8-story wellness-led building at 1177 Kane Concourse, completed in the same year. They suit you if you want a finished, lower-rise island address between Miami Beach and the mainland, and you will treat each building as its own availability question.

What is not on this list

A target year is not a set of keys. The Q4 2026 delivery calendar still lists The Ritz-Carlton Residences, Palm Beach Gardens, in a final construction phase with estimated completion in the fourth quarter of 2026, and The Ritz-Carlton Residences, Pompano Beach, as near completion with the same estimated quarter.

The Residences at Six Fisher Island is under construction in its final stage, with late-2026 delivery. Rosewood Residences on Hillsboro Mile is still aimed at a 2027 delivery, with first closings once anticipated in late 2026. None of those is delivered yet, so they stay off this table.

Advertisement

Low-rise new construction that is already complete, including four-story townhomes and a five-story Grove Isle building, is also off a towers list. Older completions from 2023 and earlier can be lived in now, but they are not this cycle’s new deliveries.

If you want keys this winter, start with the buildings already finished, then ask what is actually for sale. Browse the rest of the pipeline on Miami new developments, and see Broward’s new towers, by delivery year and Palm Beach County new towers, by delivery year for dates that still sit ahead.

Frequently asked questions

Which new South Florida towers can you move into this winter?

Fifteen delivered new-construction condominium buildings are on this list, including Una Residences in Brickell, which received its temporary certificate of occupancy in February 2026, Alba Palm Beach in West Palm Beach, completed in June 2026, and 2024 and 2025 completions such as Five Park, Aston Martin Residences, Aria Reserve South Tower and Pier Sixty-Six Residences. A completed building may not have unsold residences. Request current availability.

Advertisement

Is a 2026 delivery date the same as move-in now?

No. Several towers still carry a 2026 or late-2026 estimate and have not yet been completed or delivered. This list includes only buildings already completed or delivered, or that have a certificate of occupancy.

Which building has the most recent certificate of occupancy on this list?

Una Residences in South Brickell received its temporary certificate of occupancy in February 2026. Pier Sixty-Six Residences was delivered in 2024, and its final building received a certificate of occupancy in 2025.

Are residences still for sale in these towers?

Advertisement

Not necessarily. Completion means the building can be occupied, not that developer inventory remains. Pier Sixty-Six Residences is the one project on this list with a published from-price, $5.9 million, and inventory described as available. For every other building, request current pricing and availability.

Why are The Ritz-Carlton Residences in Palm Beach Gardens and Pompano Beach not included?

Both still carry estimated fourth-quarter 2026 delivery and are in a final phase or near completion, not delivered. If a certificate of occupancy is issued, they can be reconsidered. They are not on this winter’s move-in list today.

How are the towers ordered?

By completion or delivery year, earliest first. Within 2026, buildings with a stated month come first: Una Residences, whose temporary certificate of occupancy is dated February 2026, then Alba Palm Beach, completed in June 2026. The other 2026 buildings are listed alphabetically.

Advertisement