Broward’s new towers, by delivery year

Seven Broward new-development cards, checked November 18, 2026, after one house exclusion. Ordered by delivery year, from Pier Sixty-Six Residences, already delivered, to St. Regis Bahia Mar in 2030. A list, not a ranking.
You are trying to put a year on a stretch of the Broward coast. One campus already has a sales office talking about remaining inventory. Another still carries 2030 on the card, which means a deposit schedule that can run for years. The useful question is not which tower to put first. It is which year the card actually publishes, and what that year does to a deposit schedule. This is not a race, and it is not a ranking. It is a year-by-year reading of the Broward cards on the Miami new developments catalog, checked November 18, 2026, and rechecked the morning of November 19, 2026.
Brickell already has Brickell’s skyline is being rebuilt in waves through 2031. Edgewater has Edgewater’s new towers: one delivery year on the card, and one still to request. Downtown Miami has Downtown Miami’s new towers, by delivery year. This companion stays in Broward and is ordered by time, not by price. The live price-sorted reading is Broward County Oceanfront New Developments — Six Buildings by Entry Price, updated November 7, 2026. That list is limited to cards labeled oceanfront, leaves Pier Sixty-Six off because the card places it on the Intracoastal, and includes one project that is on our current exclusion list and is not in this year-by-year reading.
Rendering courtesy of the developer.
Seven Broward buildings remain on the New Developments catalog, checked November 18, 2026, after one house exclusion. They are ordered by each card’s delivery year, from Pier Sixty-Six Residences, already delivered, to The St. Regis Resort & Residences, Bahia Mar, in 2030. A list, not a ranking.
Seven Broward buildings remain on the New Developments catalog, checked November 18, 2026, after one house exclusion. They are ordered by each card’s delivery year, from Pier Sixty-Six Residences, already delivered, to The St. Regis Resort & Residences, Bahia Mar, in 2030. Where a landing or a developer note differs from the card, both dates are kept. A list, not a ranking.
The card is this site’s figure for delivery year and for from-price. Where a landing page, a developer note, or another dated source uses a different phrase, it is attributed and dated, not collapsed into the card year. A marketing year is not a closing date in a contract, and it is not a reason to treat a deposit schedule as settled until the offering documents say so.
| Building | Area | Card delivery | From-price (card) | Residences (card) |
|---|---|---|---|---|
| Pier Sixty-Six Residences | Intracoastal / 17th Street, Fort Lauderdale | Delivered — inventory available (card year 2024) | $5.9 million–$16 million+ | 88 |
| The Ritz-Carlton Residences, Pompano Beach | Ocean to Intracoastal, Pompano Beach | Est. delivery Q4 2026 | Inquire | 199 |
| Rosewood Residences | Hillsboro Mile, Hillsboro Beach | Est. delivery 2027; first closings anticipated late 2026 (developers, Aug. 2026) | $5.95 million | 92 |
| Waldorf Astoria Residences Pompano Beach | South Ocean Blvd, Pompano Beach | Est. completion 2027 | $2.71 million | 92 |
| Armani/Casa Residences Pompano Beach | North Ocean Blvd, Pompano Beach | Est. delivery 2028 | Inquire | 28 |
| The Ritz-Carlton Residences, Fort Lauderdale | Bayshore Drive, Fort Lauderdale | Est. delivery 2029 | $2.5 million–$10 million | 83 |
| The St. Regis Resort & Residences, Bahia Mar | Bahia Mar, Fort Lauderdale | Est. delivery 2030 | $3 million–$8 million | 239 |
Figures in the table are from the New Developments cards, fetched November 18, 2026, and unchanged on a morning re-fetch November 19, 2026. Landing differences are in the profiles below.
Request current price sheets, floor plans and a written delivery schedule for the Broward buildings in this list.
2024 on the card: Pier Sixty-Six Residences, already delivered
This is the one Broward card that has already arrived. Pier Sixty-Six Residences, on the Intracoastal at 17th Street in Fort Lauderdale, is no longer a construction-year bet. The New Developments card, fetched November 18, 2026, lists an 88-residence collection, a status of “Delivered — inventory available,” a card year of 2024, and a published price range of $5.9 million to $16 million+. The building page, last updated November 6, 2026, repeats that card status and treats the published range as historical card data, not a same-day inventory confirmation. It also keeps a separate milestone in view: Haute Residence coverage cites Indigo — described as the final building — receiving a certificate of occupancy in 2025, from a Tavistock statement dated September 2, 2025. The landing is explicit that the card year and that later certificate of occupancy are different facts and should not be collapsed. The developer on the landing and the card is Tavistock Development Company, with architecture by garciastromberg.
For a buyer, “delivered” changes the planning question. You are not waiting out years of construction draws so much as asking what inventory is still for sale, what the association documents say, and whether resort or marina privileges actually attach to a residence. Request a current package before treating the card range as today’s sheet.
2026: The Ritz-Carlton Residences, Pompano Beach
This is the near-term Pompano Beach card, and the one for a buyer who wants an ocean-to-Intracoastal campus on a 2026 clock rather than a 2030 deposit schedule. The card and the landing agree on the year. The Ritz-Carlton Residences, Pompano Beach, fetched November 18, 2026, is listed at 1380 South Ocean Boulevard, Pompano Beach, with 199 residences and an estimated delivery in the fourth quarter of 2026. The card’s from-price is “Inquire.” The landing does not publish a from-price either. The landing describes a 32-story Beach Tower and a 14-story Marina Tower, developed by Fortune International Group and Oak Capital, with architecture by Luis O. Revuelta. If that Q4 2026 line holds, the planning window is near-term: confirm the closing notice, the walk-through, and the remaining funds in the offering documents, not from the card alone.
2027: two cards, two different notes
Two buildings share a 2027 card year. They are listed together because of that year, not because one is preferred, and they are not the same clock once you read past the year.

Hillsboro Mile is the quieter stretch, and Rosewood Residences is the card for a buyer who wants that mile, not a Pompano Boulevard address, on a 2027 year. The card, fetched November 18, 2026, lists an estimated delivery of 2027 and, in the same delivery field, “first closings anticipated late 2026 (developers, Aug 2026).” The from-price on the card is $5.95 million, with 92 residences. The building page, fetched the same day, lists Starting at $5.95 million and Completion / Delivery 2027, with a status of Under Construction · Delivery 2027. Pricing and availability on the landing were last updated in August 2026. The landing does not reprint the “first closings anticipated late 2026” clause in this fetch. Those two timings are left side by side. The landing describes 92 residences in a 10-story beachfront tower and a three-story Intracoastal low-rise, developed by Related Group, Rosewood Hotels & Resorts and Dezer Development, with architecture by Arquitectonica and interiors by Piet Boon. A Related Group property fact sheet from 2023, checked October 3, 2026, on the landing, is cited there for the 70-oceanfront and 22-Intracoastal split.
Down the same ocean road, Waldorf Astoria Residences Pompano Beach is the other 2027 card, and the lower from-price of the pair — with a catch the card and the landing do not treat the same way. It is listed at 1350 South Ocean Boulevard. The card, fetched November 18, 2026, lists an estimated completion of 2027, a from-price of $2.71 million, and 92 residences. The landing, fetched the same day, states an estimated completion of summer 2027 and a from-price of $2.75 million in a November 18, 2026, sales update. The card is this site’s from-price — $2.71 million — and the landing’s $2.75 million is dated and kept beside it, not averaged. The landing also says the tower topped off in May 2026 and publishes a deposit schedule in that same November 18, 2026, sales update: 20% at contract, 10% at groundbreaking, 5% at top-off and 65% at closing. That schedule is this project’s published update, not a Broward-wide rule. The landing describes a 28-story tower with 92 residences, developed by Related Group and Merrimac Ventures, with architecture by Nichols Architects with KORA Architects and interiors by BAMO.
If you are writing a deposit or planning a move around 2027, the documents have to settle what “2027,” “summer 2027,” and “first closings anticipated late 2026” actually mean for your contract.
2028: Armani/Casa Residences Pompano Beach
This is the small-count Pompano card, and the one for a buyer who wants a single residence on a floor rather than a 200-unit campus. Armani/Casa Residences Pompano Beach is listed at 1550 North Ocean Boulevard. The card, fetched November 18, 2026, lists an estimated delivery of 2028, a from-price of Inquire, and 28 residences. The landing, fetched the same day, agrees on 2028 and describes two 19-story oceanfront towers with 28 residences, one per floor, developed by SP Development and GCF Development, with architecture by G3 AEC. The New Developments card, fetched the same day, also lists Vertical Developments and WellDuo, names the landing does not reprint. The landing’s availability line is “Limited — most residences sold.” It does not publish a from-price. A 2028 card year still means a construction-and-escrow horizon measured in years, even when most residences are already spoken for. Ask what inventory, if any, remains, and what the contract’s outside date is.
2029: The Ritz-Carlton Residences, Fort Lauderdale

The 2029 card is for the buyer who wants Fort Lauderdale’s bay, not Pompano’s sand, and is willing to plan on a longer clock. The card and the landing agree on the year and the price range. The Ritz-Carlton Residences, Fort Lauderdale is listed at 551 Bayshore Drive, with 83 residences, an estimated delivery of 2029, and a price range of $2.5 million to $10 million, on both the card and the landing fetched November 18, 2026. The landing lists a status of Pre-Construction · Sales Now Open and says pricing and availability were last updated in August 2026. It describes a 13-story, dual-tower project developed by MICL in partnership with Admire Capital, with architecture by Garcia Stromberg and interiors by Dan Fink Studio. A 2029 delivery year is a longer planning window than the 2026 and 2027 cards above: the deposit schedule, any rate-lock, and the sale of another home should be read against the offering documents, not against a catalog year alone.
2030: The St. Regis Resort & Residences, Bahia Mar
The long end of this list is a 39-acre marina-front campus, not a single slender tower, and a 2030 card year that means years of deposits. The St. Regis Resort & Residences, Bahia Mar is the latest card year here, and the one for a buyer who can live with that horizon. The card and the landing, both fetched November 18, 2026, list 239 residences, a price range of $3 million to $8 million, and a delivery of 2030. The landing describes that 39-acre marina-front campus in Fort Lauderdale, with a status of Pre Construction, and says pricing and availability were last updated in July 2026. It names Related Group, with Tate Capital and Rok Acquisitions, and architecture by Arquitectonica, with interiors by Tara Bernerd & Partners. A street number is not stated on the landing in this reading, so none is given here. There is no reason to treat 2030 as a week you can already circle on a moving calendar.
Request current price sheets, floor plans and a written delivery schedule for the Broward buildings in this list.
Frequently asked questions
Which Broward new towers are on this list, and in what year?
Seven buildings on the New Developments catalog, checked November 18, 2026, after one house exclusion, ordered by each card’s delivery year: Pier Sixty-Six Residences, already delivered (card year 2024); The Ritz-Carlton Residences, Pompano Beach, estimated Q4 2026; Rosewood Residences and Waldorf Astoria Residences Pompano Beach, 2027 on the card; Armani/Casa Residences Pompano Beach, 2028; The Ritz-Carlton Residences, Fort Lauderdale, 2029; and The St. Regis Resort & Residences, Bahia Mar, 2030.
Is this the same as the Broward list by entry price?
No. Broward County Oceanfront New Developments — Six Buildings by Entry Price is sorted by published entry price and is limited to cards labeled oceanfront. It leaves Pier Sixty-Six off and includes one project that is on our current exclusion list. This companion is ordered by delivery year.
Is Pier Sixty-Six Residences already delivered?
The card, fetched November 18, 2026, says “Delivered — inventory available” and lists a card year of 2024. The landing, updated November 6, 2026, repeats that status and separately cites a 2025 certificate of occupancy for Indigo, from a Tavistock statement dated September 2, 2025. Those milestones are not treated as the same fact.
Do Rosewood Residences and Waldorf Astoria Residences Pompano Beach deliver at the same time?
Both cards, fetched November 18, 2026, carry a 2027 year. They are not identical. Rosewood’s card also says first closings are anticipated in late 2026 (developers, August 2026), while its landing lists 2027 only. Waldorf’s landing lists summer 2027. Confirm the dates in each contract.
Why does Waldorf Astoria Residences Pompano Beach show two from-prices?
The card, fetched November 18, 2026, lists $2.71 million. The landing’s November 18, 2026, sales update lists $2.75 million. The card is this site’s card figure. The landing figure is dated and kept beside it, not averaged.
When is The St. Regis Resort & Residences, Bahia Mar expected to deliver?
The card and the landing, fetched November 18, 2026, both list 2030, with a price range of $3 million to $8 million and 239 residences. Pricing and availability on the landing were last updated in July 2026. That is a catalog year, not a closing appointment.
Is this a ranking of Broward towers?
No. The buildings are ordered by the delivery year on each New Developments card, checked November 18, 2026. Inclusion is not a preference.