HAUTE RESIDENCEHL REAL ESTATE GROUP☎ +1 (800) 257-5661
Newsroom · Buyer Intelligence

Edgewater’s new towers: one delivery year on the card, and one still to request

By Haute Residence Editorial ·
Edgewater’s new towers: one delivery year on the card, and one still to request

As of November 14, 2026, Haute Residence’s Edgewater board carries two landing pages. Villa Miami’s card lists estimated delivery in 2027. EDITION Residences, Miami Edgewater publishes no year. A companion to the Brickell and West Palm Beach delivery-year lists, not a ranking.

On the Edgewater walk, the bay is close enough that a buyer can point at a tower and ask when the keys actually arrive. As of November 14, 2026, Haute Residence’s Edgewater board gives a dated answer for only one of the two landing pages it carries.

This is a companion to the live lists of Brickell new towers by delivery year and West Palm Beach new construction by delivery year. The method is the same. The new-development card wins. A year that cannot be dated to a card or to a developer source is not forced into the table. This is not a ranking, and it is not a census of every crane in the neighborhood.

Advertisement

Rendering courtesy of the developer.

As of November 14, 2026, Haute Residence’s Edgewater new-development board carries two landing pages. Villa Miami’s card lists estimated delivery in 2027, last tied to a fact sheet verified August 30, 2026, with topped-out status checked November 13. EDITION Residences, Miami Edgewater publishes no delivery year on its card. This is a dated list, not a ranking.

The year on the card

Building Delivery year Status on the card Source and date
Villa Miami 2027 (estimated) Topped Out · Under Construction Haute Residence landing page, fetched November 14, 2026. The glance card lists “Delivery 2027 (est.).” The page dates its base fact sheet to August 30, 2026, and says topped-out status was checked November 13, 2026. The new-development card carries the same estimated year.

Confirm the year in the project’s current documents. An estimated delivery year moves.

Artist’s conceptual aerial rendering of EDITION Residences, Miami Edgewater, a bayfront tower along the Edgewater shoreline.
EDITION Residences, Miami Edgewater. Rendering courtesy of the developer. The image also carries an on-image artist’s-conceptual-rendering notice.

Rendering courtesy of the developer.

The tower with no year on the card

EDITION Residences, Miami Edgewater, at 2121 N Bayshore Drive, is on the same board. Its landing page, fetched November 14, 2026, lists the status as pre-construction and the delivery line as “Request the latest timing.” The new-development card leaves the year field empty and repeats “Request timing.”

Advertisement

A 2029 completion has been reported in trade coverage, and Haute Residence’s November 13, 2026 demolition article already treated that year as a single-source figure, not as a date confirmed from the developer’s materials. The official pages and the card reviewed for this list still do not publish a year. It is not entered in the table above. A buyer should take the completion language from the purchase agreement, and should request current timing from the project.

The same demolition article is the place to read the site’s present condition, not this list: Biscayne 21 is coming down.

Artist’s conceptual rendering of the arrival court at EDITION Residences, Miami Edgewater, with a flowered canopy and a view toward the bay.
The planned arrival at EDITION Residences, Miami Edgewater, from the Haute Residence landing page. Rendering courtesy of the developer.

Rendering courtesy of the developer.

How to read a short board

Two landing pages is the inventory this method allows, not a failure of the neighborhood. Other Edgewater names appear in news coverage or in older posts; they are omitted here because they do not have a current Haute Residence card or landing page against which a year can be dated.

Villa Miami’s own topping-out is already on the site, in Villa Miami tops out at 56 stories in Edgewater, published October 29, 2026. This list does not rewrite that report. It uses the live card’s 2027 estimate, with the verification dates the page itself publishes.

Advertisement

A delivery year is a planning number until it is written into the contract you actually sign. The card is where this list starts. The documents are where it should end.

Sources

Frequently asked questions

How many Edgewater towers are on this list?

Two. As of November 14, 2026, those are the Edgewater projects with Haute Residence landing pages: Villa Miami and EDITION Residences, Miami Edgewater. This method does not add buildings that have news posts but no current card.

Advertisement

What delivery year does Villa Miami publish, and as of when?

The landing-page card lists estimated delivery in 2027. The page, fetched November 14, 2026, dates its base fact sheet to August 30, 2026, and says topped-out status was checked November 13, 2026. Confirm the year in the current documents.

Why is EDITION Residences, Miami Edgewater not in the year table?

Its card, fetched November 14, 2026, publishes no delivery year. The delivery line reads “Request the latest timing,” and the new-development card leaves the year field empty. Towers with no year stay in a separate note.

Is 2029 the official EDITION completion year?

No official year was published on the card or on the landing page reviewed November 14, 2026. A 2029 figure has appeared in trade coverage and was already treated as a single-source report in Haute Residence’s November 13 demolition article. It is not entered as a table year here.

Is this a ranking?

No. The towers are ordered only by whether a dated delivery year appears on the card. There is one year in the table.

How does this relate to the Brickell and West Palm Beach lists?

It is a companion, using the same method: only projects with Haute Residence cards, with each year dated, and with the card winning. It cross-links both live lists.

Advertisement

What about other Edgewater buildings mentioned in older coverage?

They are omitted here if they do not have a current Haute Residence landing page against which a year can be dated. This is a card list, not a crane census.