Buying a Palm Beach spec house before it’s finished

A spec house is a home a builder starts before there’s a buyer. Buy one mid-construction and you can be on the island sooner than with a custom build, as long as the contract, the escrow and your inspector do the work a finished house would have done for you.
Buying a Palm Beach spec house before it’s finished means buying a contract, a set of plans and a completion date, not a house you can walk through. Protect yourself with a written spec and allowance list, a deposit held in escrow, your own inspector, and a closing tied to the certificate of occupancy.
The upside is time: no lot hunt, no architect, no permitting marathon. The risk is also time, plus money, if the house runs late, the deposit isn’t protected or the finished rooms don’t match the rendering.
You’re buying a promise, so read it like one
What you’re really buying is the builder’s commitment to finish a specific house, on a specific lot, to written plans, by a date in the contract.
Get the plans, the specifications and the allowance list. If a finish says “builder’s choice” or “allowance,” get the dollar amount in writing. Then walk the lot. Stand where the living room will be and look at the light, the neighbors and the water, because those won’t change when the walls go up.
It suits you if you want a new house in Palm Beach and can live with a closing date that’s still on paper. It’s a harder fit if you need keys next month or don’t plan to hire your own inspector and a Florida real estate attorney.
Put the deposit where Florida law says it can go
Florida has a rule for deposits on new one- and two-family homes. Under section 501.1375 of the Florida Statutes, a builder or developer who sells or builds 10 or more such homes a year statewide must tell you that your deposit, up to 10 percent of the price, goes into escrow unless you waive that right in writing. The escrow holder can be a bank, a savings and loan, a trust company, an attorney who’s a member of The Florida Bar, a licensed Florida real estate broker or a title insurer.
Two details matter. If a covered builder wants to use escrowed money for construction, the law requires notice to you and a surety bond payable to you, when one is available.
If no bond is available, the builder may borrow an equal amount for construction, and up to 12 months of that loan’s interest can be charged to you at closing. And a builder who sells or builds fewer than 10 homes a year isn’t covered at all. Either way, ask for a written escrow agreement: who holds the money, when it can be released and what happens if the house isn’t finished.
A waiver request isn’t boilerplate. Treat it as a real decision.
Condo deposits are a different animal. For the 50 percent pre-construction conversation, see our guide to pre-construction deposits in Florida, and for flipping a contract before closing, our guide to assignment rights. A spec house needs a house contract, not a condo form with the address changed.
| What to lock in the contract | Why it matters |
|---|---|
| Plans, specifications and allowances | The finished house matches what you agreed to buy |
| Completion date, with closing tied to the certificate of occupancy | You don’t close on a house you can’t move into |
| Deposit escrow, and any written waiver | Up to 10 percent can sit with a qualified escrow holder |
| Your right to independent inspections | You see the work before drywall and again before closing |
| A punch-list process | Unfinished work has a written path to completion |
| Title, lien and permit status | You don’t inherit someone else’s construction bill |
Inspect the work, then wait for the certificate
Don’t rely on the builder’s walkthrough. Hire your own inspector for a pre-drywall visit, while the walls are still open, and a final inspection before closing. On the island, look hard at the roof, the impact windows, flood protection and any work that needed a town permit.
The certificate of occupancy is the town’s sign-off that the house can be lived in. Florida’s deposit statute counts a buyer’s failure to close after it’s issued as a default, so you want the mirror-image protection: no closing, or a clearly written holdback, until the certificate is issued and the punch list is agreed.
The Town of Palm Beach has its own permitting and design review. Ask the builder for the permits and any design approvals already granted, and whether any remaining work still needs a town review.
Before closing, have your attorney and title company run the usual searches, including construction liens. A house still being finished is a house still being billed. Our rundown of closing costs on a $5 million South Florida home covers the rest of the closing math.
What a spec house won’t give you
It won’t be designed around your kitchen. Changes mid-build cost time and money, and some need the town’s approval. And it won’t promise a move-in week unless the contract says so, with a real remedy if the date slips.
If a finished house or a new condo starts to look cleaner, see Palm Beach County new towers, by delivery year.
The short version: buy the paperwork as carefully as you’d buy the house. Walk the lot, escrow the deposit, inspect the work, and don’t close until the certificate is in hand.
Request current price sheets, floor plans, deposit schedules and rental rules for Palm Beach spec houses and new residences for sale.
Frequently asked questions
What is a spec house?
A home a builder starts without a buyer. You buy the house and the remaining work under contract, instead of designing a custom home from a vacant lot.
Does Florida require my deposit to be held in escrow?
If the seller builds or sells 10 or more one- or two-family homes a year statewide, Florida law requires them to tell you that your deposit, up to 10 percent of the price, goes into escrow unless you waive that right in writing. With a smaller builder, negotiate a written escrow agreement anyway.
Can a builder spend my escrowed deposit?
Under Florida’s statute, a covered builder can release escrowed funds for construction only after notifying you and getting a surety bond payable to you. If no bond is available, the builder may instead borrow an equal amount, and up to 12 months of that loan’s interest can be charged to you at closing.
Can I close before the certificate of occupancy?
Only if the contract allows it, and it’s rarely wise. Make the certificate a closing condition, or negotiate a clearly written holdback.
Do I need my own inspector?
Yes. Book a pre-drywall inspection while the walls are open and a final inspection before closing.
How is this different from buying a pre-construction condo?
A spec house is a single-family home on its own lot, covered by Florida’s house-deposit statute. Condo deposits, draw schedules and assignment rights follow a different set of documents.